Metalark

 
 

how Metalark works with C3 Data


Metalark reads furnace status from C3 through C3's API, takes in C3's email reports, and imports C3 site reports, so pyrometry records stay in C3 and show up where the shop schedules, certifies and ships work.

  • Your furnaces' pyrometry status comes into Metalark. The shop's admin enters the shop's own C3 login on Metalark's Settings screen; no login is shared between shops, and the password is never shown or logged. Metalark then asks C3's integration API for each furnace's verdict (Red, Yellow, Green or Unknown) with its CAL and SAT status and dates and a TUS status for every operating range. It asks when a compliance screen opens and reuses the answer for up to two minutes. Documents C3 emails to the shop (TUS, SAT, calibration and sensor certificates, and site reports) are collected every five minutes, sorted by type and queued for review; a site report also refreshes the furnace configuration on its own.

  • C3 furnaces are linked to Metalark equipment. Metalark imports the furnaces C3 already tracks and links each one to a Metalark furnace by C3's own furnace ID, falling back to the furnace name the first time. The admin sees exactly what will be created, updated or skipped before anything is saved. Due dates come across; temperature limits do not, because C3 does not state their unit and Metalark will not guess Fahrenheit or Celsius.

  • Completed C3 jobs become calibration records in Metalark. C3's Job List export (Tests > Export in the C3 portal) is imported into Metalark. Each completed SAT and TUS becomes a SAT or TUS record on the right furnace, and the furnace's next SAT, TUS and instrument calibration due dates are updated from it. Those dates are what the furnace gate checks. Importing the same file twice adds nothing twice, and furnaces the shop manages on paper are left alone.

  • A furnace runs only when all four checks pass. Metalark decides whether a furnace is compliant on four counts:

    1. Instrument calibration (CAL) is current and passing.

    2. The system accuracy test (SAT) is current and passing.

    3. The temperature uniformity survey (TUS) is current and covers the temperature.

    4. Every thermocouple in use is compliant, approved for use, and has not exceeded its allowable usage by date or by number of uses.

  • Quality hears about it when it matters. Once a day Metalark checks every furnace's SAT, TUS, instrument calibrations and thermocouple usage against AMS 2750, opens a finding for anything coming due or overdue, and closes it again once the work is recorded. Each new finding goes straight to the shop's quality engineers and quality manager in one alert, in Metalark and by email where the shop has mail set up, with the critical ones listed first. The moment that matters most is when work is committed to a furnace: the furnace gate, which each shop sets to off, warn or block, warns or stops the job when a load is scheduled, a load plan is accepted, a certificate is issued or an order ships. The gate's verdict at certificate issue is kept in the audit trail.